Chevron Station — Inglewood, CA
- 60-day HVDPE event (2013); targeted free product removal
- >10,000 lbs hydrocarbons extracted
- Case closure achieved (2016)
Dodger Stadium (Former Unocal) — Los Angeles, CA
- 90-day HVDPE (2020) after long site history (2000–2020)
- Mass reduction achieved; LTCP low-risk levels reached
- Case closure granted October 2021
US Navy — Bangor, WA
- 30-day HVDPE for gasoline + PFAS over a large impact area
- Vapors thermally abated ~1,900°F; groundwater carbon + PFAS media
US Navy — Keyport, WA
- 90-day pilot; CVOC contamination >500,000 ppb from 5’–25’ bgs
- DTW lowered to 16’–17’; air sparging final 30 days
- ~900 lbs total CVOCs removed; full-scale under consideration
Kennett Conoco — Missouri
- 4 high-powered mobile HVDPE units; multi-well extraction
- ~7M gallons groundwater removed (~21 months)
- ~404,000 lbs vapor-phase gasoline removed (~12 months)